McLEAN TAYLOR CONSTRUCTION
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Kitchener 5A Storage Tank
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Strange Street Water Supply Station
    • Hopewell Crossing Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Kitchener 5A Storage Tank
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Strange Street Water Supply Station
    • Hopewell Crossing Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
PROJECT:

Hopewell Crossing Pumping Station

BRESLAU, ONTARIO
DESCRIPTION:
Construction of new sewage pumping station including installation of new rectangular concrete secant caisson shoring structure in high ground water conditions. 
  • Construction of 15m deep reinforced concrete wetwell, drywell and emergency storage tank, complete with tipping bucket sediment flushing system. 
  • Construction of masonry building to house new pumping equipment.
  • Installation of 3 activated carbon odour control units and 2 tonne overhead monorail for pump removal.  
  • Install and connect new electrical service from onsite transformer including an emergency power standby natural gas generator complete with exhaust system.
  • Supply, install, test and commission all equipment and vendor supplied PLC’s.  
Picture
Picture

Contact Us

Picture
519.284.2580

Picture
McleanTaylor@McleanTaylor.com

Follow Us

Picture
Picture
Picture
Picture
Picture

Find Us

Picture
100 Water Street South, P.O. Box 190 St. Marys, Ontario N4X 1B1

Policy statements

Read our Privacy Policy
Read our ​Accessible Customer Service Policy
Picture
© McLean Taylor Construction Limited 2022. All right reserved.
website by bob bender design