McLEAN TAYLOR CONSTRUCTION
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
PROJECT:

Kitchener 5A Storage Tank

KITCHENER, ONTARIO
DESCRIPTION:
This project consisted of digester refurbishment as sludge storage tank at the Kitchener wastewater treatment plant, including:
  • Removal of existing steel dome and process piping.
  • Supply and installation of new Greatario domed roof.
  • Concrete repairs to interior of tank. Supply and install new interior waterproof coating.
  • Coordination with and working alongside specialty subcontractor.
  • Supply and install new process piping, equipment, instrumentation and electrical.
  • Coordination with the Region's plant operators (OCWA) to ensure plant operations are not disrupted.
Picture
Picture
Picture

Contact Us

Picture
519.284.2580

Picture
[email protected]

Follow Us

Picture
Picture
Picture
Picture
Picture

Find Us

Picture
100 Water Street South, P.O. Box 190 St. Marys, Ontario N4X 1B1

Policy statements

Read our Privacy Policy
​Read our ​Accessible Customer Service Policy
Read our Accessibility Compliance Report 
Read our Multi Year Accessibility Plan
Read our Return To Work Plan
Read our Individual Accommodation Plan
Picture
© McLean Taylor Construction Limited 2022 – 2025. All right reserved.
website by bob bender design