McLEAN TAYLOR CONSTRUCTION
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
PROJECT:

Old Mill Sanitary Pumping Station

Kitchener, ONTARIO
DESCRIPTION:
Construction of new sewage pumping including a sheet pile shoring structure in high ground water conditions. 
 
  • Construction of 13m deep reinforced concrete wetwell, drywell and emergency storage tank, complete with tipping bucket sedimentary flushing system
  • Construction of architecturally significant masonry building
  • Disposal of Contaminated Soil
  • Installed and connected new electrical service from onsite transformer including an emergency power standby diesel generator complete with exhaust system.
  • Significant road works including new storm, sanitary and forcemain watermain
  • Demolition of existing pumping station
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

Contact Us

Picture
519.284.2580

Picture
McleanTaylor@McleanTaylor.com

Follow Us

Picture
Picture
Picture
Picture
Picture

Find Us

Picture
100 Water Street South, P.O. Box 190 St. Marys, Ontario N4X 1B1

Policy statements

Read our Privacy Policy
Read our ​Accessible Customer Service Policy
Our Accessibility Compliance Report 
Our Multi Year Accessibility Plan
Picture
© McLean Taylor Construction Limited 2022. All right reserved.
website by bob bender design