McLEAN TAYLOR CONSTRUCTION
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Kitchener 5A Storage Tank
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Strange Street Water Supply Station
    • Hopewell Crossing Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Kitchener 5A Storage Tank
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Strange Street Water Supply Station
    • Hopewell Crossing Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
PROJECT:

Rondeau Jetty 5 Rehabilitation

MUNICIPALITY OF CHATHAM-KENT, ONTARIO
DESCRIPTION:
Rondeau Harbour is located at the west end of Lake Erie, approximately 30 km south-east of Chatham, Ontario. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada. This project consisted of the complete removal and replacement of a Jetty for the Department of Fisheries and Oceans at the Rondeau Fisherman’s Basin in Erieau, ON. The project included:
  • Complete removal of the existing precast concrete slabs and wooden piles using a barge, excavator, and crane
  • Drive new open ended  steel pipe piles with mobile pile driver positioned on a barge
  • Fabricate and install structural steel frame/support system, form and pour new concrete deck
  • Reinstall existing rubber fenders around perimeter of deck
  • Fabricate and install new steel curbs around perimeter of deck
  • ​Install electrical receptacles on Jetty. 
Picture

Contact Us

Picture
519.284.2580

Picture
McleanTaylor@McleanTaylor.com

Follow Us

Picture
Picture
Picture
Picture
Picture

Find Us

Picture
100 Water Street South, P.O. Box 190 St. Marys, Ontario N4X 1B1

Policy statements

Read our Privacy Policy
Read our ​Accessible Customer Service Policy
Picture
© McLean Taylor Construction Limited 2022. All right reserved.
website by bob bender design