McLEAN TAYLOR CONSTRUCTION
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
  • Home
  • About Us
    • Inside Team
    • Connections
    • Gallery
  • McLean Taylor
    • Blackfriars Bridge
    • Gully Creek Bridge
    • Lantz Bridge
    • Chepstow Culvert
    • Rondeau Jetty 5
    • St. Marys
    • Railway Bridges
    • Other Recent Projects
  • Stone Town
    • Old Mill Sanitary Pumping Station
    • Kitchener 5A Storage Tank
    • Strange Street Water Supply Station
    • Ottawa-Trussler Pumping Station
    • Doon South Pumping Station
    • Other Recent Projects
  • Concrete Barrier/Traffic Control
  • Services
    • Pile Driving
    • Structural Steel Repair
    • Deck Finishing
    • Bridge Jacking
    • Shoring
    • Bridge Access and Inspection
    • Demolition
    • Cofferdams/Dewatering
  • Contact
    • Careers
PROJECT:

Ottawa-Trussler Pumping Station

KITCHENER, ONTARIO
DESCRIPTION:
This project involves the construction of Ottawa-Trussler Pumping Station (OTPS) within the proposed Ottawa Trussler Subdivision on Nathalie Street. The station will collect sanitary flows from the proposed subdivision of approximately 40ha as well as limited lands to the south of Ottawa Street along Trussler Road. 
  • Construction of a new cast-in-place reinforced concrete pumping station structure complete with one wet well, one emergency storage tank, associated equipment and appurtenances.
  • Construct site grading and finishes as shown on the contract drawings including, asphalt drive, asphalt access and parking area, gates, bollards, landscaping, and fencing.
  • Site restorations, including associated grading, paving, parking space, fencing, topsoil, seed and all other landscaping.
Picture

Contact Us

Picture
519.284.2580

Picture
[email protected]

Follow Us

Picture
Picture
Picture
Picture
Picture

Find Us

Picture
100 Water Street South, P.O. Box 190 St. Marys, Ontario N4X 1B1

Policy statements

Read our Privacy Policy
​Read our ​Accessible Customer Service Policy
Read our Accessibility Compliance Report 
Read our Multi Year Accessibility Plan
Read our Return To Work Plan
Read our Individual Accommodation Plan
Picture
© McLean Taylor Construction Limited 2022 – 2025. All right reserved.
website by bob bender design